Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Crossrail – Victoria Dock project with contractor Newton and Frost

The London Crossrail scheme features the Victoria Dock project, which will enable high frequency trains travelling on the existing surface infrastructure to move underground and into the tunnelled section on the new Elizabeth line. The Crossrail programme commenced in 2012 and features 10 new stations.

admin Avatar

The London Crossrail scheme features the Victoria Dock project, which will enable high frequency trains travelling on the existing surface infrastructure to move underground and into the tunnelled section on the new Elizabeth line. The Crossrail programme commenced in 2012 and features 10 new stations, with the aim of improving congestion and travel times in London.

Project requirements:

ExMesh™ Engineering was appointed by Crossrail contractor Newton and Frost Fencing Ltd to design and manufacture one-off pedestrian emergency exit gates as part of the Victoria Dock Crossrail project.

Newton and Frost required high quality gates to be manufactured within a very tight timescale, ready for installation in a highly visible residential location.

Project activity:

ExMesh™ Engineering worked closely with Newton and Frost and the contracted architects to produce the project drawings and layouts while also evaluating and advising on any potential certification breaches or considerations for the project.

Site visits were initially carried out at various locations to scope the project requirements.

ExMesh™ Engineering manufactured the exclusively commissioned gates and fencing using cut to size mesh panels to create 2.4m high and 3m high Class 3 base plated fencing and gates with a powder coated black finish.

The contractors specified that because the project was in a highly residential area, noise pollution was to be considered. The solution was to make the panels at its 25,000 sqm site in Hartlepool which minimised noise and disruption to the site’s surrounding area.

The emergency gates incorporated specific high security locks from Mico Tindall and single deadlocking mechanisms – revolutionary for ExMesh™ Engineering, as this was the first time the high security locks had been used with the ExMesh™ Engineering security range.